先锋影音资源2中文字幕,色戒电影观看完整版,中国单亲乱xxxxiuiu,亚洲视频手机在线观看,不忠电影未删减完整版1080 ,超碰爱爱,人猿泰山成人未删减版迅雷

Electricians dispatched to repair high voltage wire to ensure post-holiday travel peak in China's Wuhan

Source: Xinhua| 2019-02-24 07:21:07|Editor: Li Xia
Video PlayerClose

CHINA-WUHAN-ELECTRICIAN-RUSH REPAIR (CN)

Photo taken on Feb. 12, 2019 shows electrician Wang Chaolin climbing the power transmission tower for rush repairs in the mountain area of Wuhan, capital of central China's Hubei Province. A team of electricians was dispatched to repair a high voltage wire that was broken due to thick layer of ice accumulation. After one day's work on the over 40-meter-high power transmission tower in bad weather condition, the team succeeded in fixing the failed power system that lowered the trains' speed causing delay during the post-holiday travel peak. This year's Spring Festival travel rush started on Jan. 21 and will last till March 1, with railway trips expected to hit 413 million in total, up 8.3 percent. (Xinhua/Xiao Yijiu)

   Prev 1 2 3 4 5 Next  

KEY WORDS:
EXPLORE XINHUANET
010020070750000000000000011100001378454891